Project Overview
This project involved the demolition of a hotel and construction of a mixed use infill building with commercial units on the ground floor and a single residence on first and second floors. The building which is located in a sensitive coastal area is designed to maximize sea views while also containing private sheltered open areas within the building.
Peter Martin Engineering Ltd was appointed to Pier House to help design, fabricate and fit 2No. Structural Stairs, Freestanding glass balustrades, Railings, Point fixed glass balustrades, Curved/Raking vertical balustrading, Gas fire surrounds, Pond fixtures, handrails and Gates.